I tried a few times to have two versions of version 9 soft wear open to do two different jobs at the same time like version 8 allows.The second open version of version 9 loads and you can set up the job but the program will not do anything until the 1st job is done.Also i can't find in settings the check box to allow 2 versions of fab to run at the same time.I sure hope this was a oversight and will be fixed.